Welsh Wildlife Trust

Greenlands Energy were tasked with delivering a comprehensive renewable energy solution for the Welsh Wildlife Trust. The project involved designing, installing and commissioning a Photovoltaic (PV) and Battery Energy Storage System tailored to meet the Wildlife Trust’s Energy needs. Our team carried out an in-depth site assessment and technical evaluation to develop a custom deisgn to meet our client’s needs. From the initial stages through to commissioning, the entire process was managed seamlessly, ensuring the project was
completed on schedule.

We Offer:

Detailed Technical Design.
G98 / G99 Application.
Supply, Installation and Commissioning.
In-House Scaffolding Service.
MCS Registration.
Handover Documentation.

Request A Quote

    Telephone: 01495 307 078

    info@greenlandsheating.co.uk

    Stay connected with Greenlands Energy and be the first to know about our latest projects, community initiatives, and advancements in renewable energy by following our blog.

    Project Case Study

    • 1 x SolarEdge 10kW Three Phase Hybrid Inverter.
    • 1 x SolarEdge 8kW Three Phase Hybrid Inverter.
    • 1 x SolarEdge 7kW Three Phase Inverter.
    • 6 x SolarEdge 4.6kWh Three Phase Batteries.
    • 81 x SolarEdge S500 Power Optimisers.
    • 1 x SolarEdge Firefighter Gateway.
    • 1 x SolarEdge Modbus Energy Meter.
    • System Size – 34.83 kWp
    • 81 x Canadian Solar 430w Panels.

    Project Savings

    CO2 Emissions Saved

    11.66 tonnes / Year

    Equivalent Trees Planted

    535 Trees / Year

    Estimated Annual Generation

    60,273 kWh