Welsh Wildlife Trust
Greenlands Energy were tasked with delivering a comprehensive renewable energy solution for the Welsh Wildlife Trust. The project involved designing, installing and commissioning a Photovoltaic (PV) and Battery Energy Storage System tailored to meet the Wildlife Trust’s Energy needs. Our team carried out an in-depth site assessment and technical evaluation to develop a custom deisgn to meet our client’s needs. From the initial stages through to commissioning, the entire process was managed seamlessly, ensuring the project was
completed on schedule.
We Offer:
Request A Quote
Telephone: 01495 307 078
info@greenlandsheating.co.uk
Stay connected with Greenlands Energy and be the first to know about our latest projects, community initiatives, and advancements in renewable energy by following our blog.
Project Case Study
- 1 x SolarEdge 10kW Three Phase Hybrid Inverter.
- 1 x SolarEdge 8kW Three Phase Hybrid Inverter.
- 1 x SolarEdge 7kW Three Phase Inverter.
- 6 x SolarEdge 4.6kWh Three Phase Batteries.
- 81 x SolarEdge S500 Power Optimisers.
- 1 x SolarEdge Firefighter Gateway.
- 1 x SolarEdge Modbus Energy Meter.
- System Size – 34.83 kWp
- 81 x Canadian Solar 430w Panels.
Project Savings
CO2 Emissions Saved
11.66 tonnes / Year
Equivalent Trees Planted
535 Trees / Year
Estimated Annual Generation
60,273 kWh