Afon Court

Greenlands Energy were tasked with delivering a comprehensive renewable energy solution for H C Capel and Sons Limited. The project involved designing, installing and commissioning a Photovoltaic (PV) System using SolarEdge Inverters, Panel Optimisation tailored to meet the Energy needs of the industrial units at Afan Court, Bedwas Industrial Estate, Caerphilly.

Our team carried out an in-depth site assessment and technical evaluation to develop a custom design to meet our client’s needs. From the initial stages through to commissioning, the entire process was managed seamlessly, ensuring the project was completed on schedule.

We Offer:

Detailed Technical Design.
G98 / G99 Application.
Supply, Installation and Commissioning.
In-House Scaffolding Service.
MCS Registration.
Handover Documentation.

Request A Quote

    Telephone: 01495 307 078

    info@greenlandsheating.co.uk

    Stay connected with Greenlands Energy and be the first to know about our latest projects, community initiatives, and advancements in renewable energy by following our blog.

    Project Case Study

    • 1 x SolarEdge 100kW Three Phase Inverter.
    • 1 x SolarEdge Firefighter Gateway.
    • 1 x SolarEdge Modbus Energy Meter.
    • 133 x SolarEdge S1400 Power Optimisers.
    • 266 x Trina Solar 555watt Panels.
    • Renusol Trapezoidal Metal Roof Mounting System.
    • 1 x Three Phase PV Distribution Board.
    • System Size – 147.63 kWp

    Project Savings

    CO2 Emissions Saved

    25.31 tonnes / Year

    Equivalent Trees Planted

    1,162 Trees / Year

    Estimated Annual Generation

    130,880 kWh